200,000 tonnes, four lines, one site
All capacity sits in the Yanhua Industrial Park, Dingyuan, Anhui. Raw material in, pallet out, without leaving the site — no intermediate bagging, no transhipment. That is how a 75-tonne batch still lands consistent.
| Item | Value |
|---|---|
| Reactors | 9 (Plant I) + 11 (Plant II) |
| Reactor volume | ≈ 90 m³ · 75 t full charge |
| Batches per year | 9 × 300 ≈ 2,700 |
| Design capacity | ≈ 202,500 t/yr |
| Belt coolers | 33,315 × 2,000 mm (B2000) |
| Packing | 1,000 bags/h × 25 kg = 25 t/h |
Seven steps, melt never touches the floor
Esterification to end-capping happens in the reactor; after discharge the melt falls by gravity to the belt on the ground floor. No long pumping of high-viscosity material, one less pass of shear and degradation.
Charging
Acids and polyols metered to the reactor
Esterification
230—250 °C, atmospheric, about 10 h
Polycondensation
240 °C at −0.1 MPa, small molecules removed
End-capping
190—200 °C — acid value fixed here
Discharge
170—200 °C melt onto the water-cooled belt
Flaking
Cooled belt into an enclosed crusher
Packing
25 kg net, fully automatic FFS, 1.5 t pallets

25 kg to 1.5 t, no manual step
Form-fill-seal in one pass; the palletiser builds 2+3 groups, 12 layers, 60 bags, 1.5 t per pallet. Bags carry a 20 × 50 mm solid colour mark for optical registration.
Four lines
Plant I
78 × 40 × 18.2 m
9 reactors · 5 flaking lines
Plant II
11 reactors · 5 flaking lines
with utilities
HAA plant
68 × 16 × 22.8 m · 4 floors
20 reactors · 20 crystallisers · 20 dryers
Packing
FFS automatic line
1,000 bags/h · 1,200 bags/h palletising